The scope of work of this project is to perform the procurement, construction, testing and start-up services for :

Scope of Work

  • The installation of a high level smokeless flare stack and the high pressure relief header system.
  • The installation of a high level vapour vent system for the low pressure relief system.
  • Upgrading of an existing vapour relief system.
  • The required modification to the existing relief valve installations including replacement of the majority of the relief valves.
  • The installation of two new solvent tanks complete with the associated pumps, piping instrumentation and electrical works.
  • The installation of a substation to expand and modify the power, lighting, control, and protective systems of the refinery.
  • The tie-in of the new or modified systems will be made during four planned shutdowns varying from seven to one day duration.
Jeddah, Saudi Arabia
23 Millions
Saudi Arabian Bechtel
Dec. 1992 To Apr. 1994
COMPLETED INDUSTRIAL
Bechtel