Print
Project Details
Location
Value in SR
Client
Period
Type
Consultant

Project Description

Scope of Work
The scope of work of this EPC contract includes the following:

  •  One unit GE frame 7EA power plant.
  • Fuel system including fuel skids and pipes.
  • Extension of fire fighting systems to cover the new installations.
  • Supply & installation of electrical systems including extension of existing 132kV GIS, new step-up transformers, 132kV XLPE cables, auxiliary transformers and MV witchgear.
  • SCADA systems, protection & control and telecommunication systems.
  • Civil works / Buildings
    • Battery
    • Switchgear Building
    • Workshop
    • Shed Steel Structure
Asir, Saudi Arabia
105 Millions
SEC-SRB
10/1/2002 to 20/12/2003
POWER GENERATION & TRANSMISSION
By the Client